LDMC脉喷单机除尘器

LDMC脉喷单机除尘器选择常州市清泉环保成套设备有限公司

一、 前言/ preface 
  LDMC型脉冲袋式除尘器是我公司设计的小型袋式除尘器。该除尘器采用高压(0.5~0.7MPa)大流量脉冲阀逐条滤袋喷吹清灰技术,具有清灰功能大,清灰效率高的特点。并且体积小、重量轻、结构简单紧凑、安装容易、维护方便。广泛用于建材、冶金、矿山、化工、煤炭、非金属矿、超细粉加工等行业的含尘气体净化处理系统。

LDMC type pulse bag filter is my company design of small bag filter. This filter adopts high voltage (0.5 ~ 0.7 MPa) big flow pulse valve headed the filter bag out dust injection technology, with clear grey function, the characteristics of high efficiency out dust. And small volume, light weight, simple and compact structure, easy installation, maintenance is convenient. Widely used in building material, metallurgy, mining, chemical, coal, nonmetalliferous ore, super fine powder processing industries of dust-contained gas purification processing system. 

二、 除尘器结构/ Filter structure
   该设备主要有以下部分组成:
The equipment is mainly have the following parts:
a. 箱体:包括袋室、净气室、多孔板、滤袋、滤袋骨架、检修门、箱体设计耐压为5000Pa。
a. case: including bag room, net of the gas chamber, porous plate, the filter bag filter bag, skeleton, access door, cabinet design pressure for 5000 Pa. 
b. 出风系统:包括风机、风机配用电机。
b. the wind system: including fan, fan motor powers. 
c. 喷吹系统:包括主气管、喷吹管、脉冲阀、控制仪。
c. injection system: including the trachea, and spray wind, pulse valve, controlling instrument. 
d.进气的排灰部分有两种形式:一种为标准带灰斗式,另一种为敞开法兰式。
d. intake of discharging part two forms: a standard for with ash hopper type, another for open flange. 

三、 工作原理/ working principle
含尘气体由进气口进入灰斗、或通过敞开法兰式口进入滤袋室,含尘气体透过滤袋过滤为净气进入净气室,再经净气室排气口,由风机排走。粉尘积附在滤袋的外表面,且不断增加,使袋除尘器的阻力不断上升,为使设备阻力不超过1200Pa,袋除尘器能继续工作,需定期清除滤袋上的粉尘。清灰是由程序控制定时顺序启动脉冲阀,使气包内压缩空气(0.5~0.7MPa)由喷吹管孔眼喷出进入滤袋使滤袋在瞬间急剧膨胀,并伴随着气流的振动作用抖落粉尘,达到清灰的目的
Dust-contained gas by the intake into ash hopper, or through the open mouth flange into the filter bag room, dust-contained gas through filter bag filter net gas into the net for the gas chamber, then the gas chamber clean air vent, come in by fan. Dust attached to the filter bag in the outer surface of the, and increase constantly, and make the resistance of the bag filter the rise, to make a device resistance not more than 1200 Pa, bag filter can continue to work, need to remove the filter bag regularly on the dust. The ash is by process control timing sequence activate pulse valve, contentious bags compressed air (0.5 ~ 0.7 MPa) controlled by spray wind out into the filter bag filter bag in the moment that has expanded, and with the vibration of the airflow shedding dust role, to clear the purpose of ash 

四、 选型/ selection
4.1 型号说明
该单机有32、48、64、80、96、112六种规格,其中每个规格分为两种安装形式,以满足不同场合的使用要求,具体型号说明如下:
4.1  model that 
The single machine has 32, 48, 64, 80, 96,, and the 112 six kinds of specifications, each one of these specifications are divided into two install form, in order to meet different occasions requests, specific models that are as follows: 


4.2 选型参数及选型原则
4.2 selection parameters and selection principles
4.2.1 收尘器选型的主要技术参数为风量、气体温度、含尘浓度与湿度。根据工艺设计的风量、气体温度、含尘浓度的 数值,按略小于技术性能表中的数值为原则,其相对应的收尘器型号,即为所需的收尘器型号。
4.2.1 Dust collector on the selection of main technical parameters for air, gas, dust concentration of temperature and humidity. According to the design process of air, gas temperature, dust concentration of the highest value, press is slightly less than the technical performance table numerical for the principle, its corresponding to collect dust, ware, that is needed for the dust collecting ware number. 
4.2.2 表中的耗气量为工厂集中供气时的情况,如单独使用空压机时,表中的耗气量要放大到1.5倍。
4.2.2 The table of gas consumption on the gas supply for the factory when, for example, used alone air compressor unit, to the table of gas consumption to enlarge to 1.5 times. 
4.2.3 压缩空气耗量栏中,所提出的耗气量为该型号设备的 耗气量。
4.2.3 Compressed air consumption column, the proposed gas consumption model machines for the biggest gas consumption.
4.2.4 设备外形及基础见附图,我公司还可根据用户场地情况设计符合用户要求外形的收尘器。
4.2.4 Equipment appearance and see the appended drawings based, my company can according to user site conditions designed to user requirements of appearance dust collector. 

五、 安装调试说明/ Installation instructions
 1、收到设备即要检查除尘器所有附件是否完好,包括对有关配件箱的开箱检查,发现问题需查明原因解决后再进行安装工作。
1, receive equipment to check all the attachments that dust is in good condition, including the parts of the box open-package inspection, found that the problem should be found reasons to solve again installation work. 
2、本体:为保证设备的稳定性,安装设备的接口平面要平整, 位后要检查各连接处的密封填料、螺栓密封紧固的可靠性发现有松动处要解决以免漏风,同时对分体发运的要在连接处填上密封填料再紧固螺钉。另外要检查各种检修门槽内各密封填料有无脱落并进行嵌严实。
2, ontology: to ensure the stability of the equipment, the interface of the installation of the equipment to level off the plane, took his seat to check the sealing filler of joint bolt fastening, the reliability of the sealing found in loose to solve to avoid air leakage, at the same time for shipment in connection of fission fill in packing to tighten the screws. In addition to check all the access door slot the sealing filler for fall off and embedded firmly sealed. 
3、脉冲喷吹控制系统:压缩空气管道连接于除尘器上部位置的气包端进气管。通常设备裸装发出即出厂前将电磁脉冲阀拆下发运。所以先将每个电磁阀的进口内螺纹连接于气包上部的接管上并保证密封紧固好通过气包支架将阀的出口 统一对上喷吹管的 并用随机发运的高压橡胶管及喉箍进行连接并要保证严密不漏气。
3, pulse injection control system: compressed air pipe connections in the location of the gas filter bag end intake manifolds. Usually equipment out before they leave the factory without that the electromagnetic pulse valve dismantling the delivery. So first will each electromagnetic valve import threaded connections in the upper part of the gas bag over and ensure the seal tighten good through the air bag supports will be the center of the export unified on the center of the wind spray and random shipment of high pressure rubber hose hoops and connection and make sure not leak closely. 
将电磁阀从左到右编号通下导线按顺序按在控制仪插头各输出线上。将控制仪按指定位置 位后按控制仪说明书进行操作调试。确认电磁阀动作和控制仪匹配后接通压缩空气气源(按选用说明)气源压力正常为0.4-0.5MPa,再打开控制仪开关即可工作。
The electromagnetic valve from left to right under the wire in order number according to control apparatus plug in each output online. Will control instrument in the specified position in place after control apparatus according to the instructions debugging. Confirm electromagnetic valve action and control apparatus, matched the compressed air through air (according to choose) that normal air pressure is 0.4 0.5 MPa, then open the control device switch can work. 
以上安装、试车调试结束后即可投入系统中开始工作。当系统主风机开始工作含尘气体进入箱体后过滤开始,随着粉尘的附和过滤工况的进行设备的阻力即开始上升,当设备阻力达到0.8-1KPa时即开始供压缩空气并启动脉冲阀进行喷吹并视设备情况按控制仪说明书进行调节喷吹时间。
Above after installation, commissioning test can dive into the system began to work. When the system is the Lord fan began to work dust-contained gas into the filter after that starts with dust filter conditions for equipment with the resistance that start to rise, when the equipment resistance to 0.8 1 KPa time is to start for compressed air and activate pulse valve, the injection and depending on the equipment in the control instrument to adjust injection time.


六、 维护和保养/ maintenance and maintenance
1、壳体/ shell 
使用一段时间后发现各连接部件螺丝松动及密封加老化失去密封作用,需进行更换并紧固,并定期进行防锈刷漆。
After a period of using, found the connecting parts and seal and loose screw aging lose sealing function, need to be replaced and tighten, and regular antirust paint. 
2、设备阻力 equipment resistance 
发现设备阻力超过限定范围,则需检查原因。滤袋积灰过量原因分析:
The equipment is found more than limited scope resistance, you are required to check the reason. The filter bag analysis of the causes of formation excessive: 
(1)电磁阀失灵不喷吹→检查电磁阀及控制系统。
(1) the electromagnetic valve failure not injection-inspection solenoid valves and control system. 
(2)由于个别漏尘上箱体喷吹管喷孔堵塞→进行清理疏通。
(2) the individual leak case on dust spray wind orifices jams to clean up and dredge. 
(3)滤袋受喷吹气源油水分离不净的影响粘堵滤袋或粉尘湿度太高→进行拆洗滤袋晾开并处理好压缩空气或解决含尘气体湿度问题。
(3) the filter bag by injection air water-oil separation is not clear NianDu the influence of filter bag or dust, moisture is too high to unpick and wash the filter bag hanging open and handle the compressed air or solve dust-contained gas humidity problem. 
(4)选型不适过滤风速及浓度偏高→增大机型规格或减少系统网点降低处理量。
(4) selection filter wind speed and high concentration is to increase or reduce the system network model specification lower productivity. 
3、滤袋/ the filter bag: 
在装拆过程中要注意避免碰撞和拉毛,若破损将直接会影响除尘效率。当运行一段时间后发现出风口明显积灰、冒灰现象则表明滤袋已破损→进行更换。如在正常情况下使用一段时间有滤袋破损,根据主体内工作状态说明未破损的滤袋寿命也已很短了,因滤袋的寿命基本上由工作温度、粉尘浓度、粉尘性质和过滤风速、喷吹清灰状况而变化→建议全面进行一次更换。当然在这事前还需检查一下是否由于上口绑扎脱落而导致冒灰→全面绑扎好即可工作。
In the installation process to avoid collision and hair, if damaged will directly affect the dust removal efficiency. When running after a period of time the outlet of formation, obviously found at ash phenomenon indicates that the filter bag already damaged-for replacement. Such as under normal use for a period of time have filter bag breakage, according to work in the main body of the damage that state without the filter bag also has a very short life, for the life of the filter bag for the working temperature, dust concentration, dust nature and filtering wind speed, blowing out dust status and changes to suggest an a replacement. Of course in this advance still need to check if due to take apart and flowing binding ash-comprehensive binding good can work. 
4、脉冲阀和控制仪/pulse valve and controlling instrument 
脉冲阀正常工作时声响是清脆“扑”声音,常见故障分析如下:
Pulse valve during normal working noise is ringing "saved" sound, common fault analysis are as follows: 
(1)不响,即不喷吹原因是否控制仪电源未打开,电磁阀到控制仪的导线段裂或控制仪不工作,电磁阀线圈发生故障等→更换配件或参照脉冲控制仪说明书检修控制仪。
(1) not ring, i.e. not injection reason not to open source is control apparatus, electromagnetic valve to control instrument for the leads of the crack or control meter don't work, the electromagnetic valve failure, etc to replace coil accessories or reference of impulse control instrument maintenance manual control apparatus. 
(2)喷吹宽度过长喷吹力不足→检查是否将控制仪的宽度旋钮调整合适,或脉冲阀失去弹力→进行更换。
(2) injection width too long injection insufficient to check whether will control the width of the instrument knob suitable, or pulse valve lose stretch-for replacement. 
(3)气包压力上不去有漏气声使排气道常开并且不能喷吹→检查供气压力是否达到0.4MPa以上,另外请检查脉冲阀的膜片是否发生了破裂或磨损→更换膜片即能工作。
(3) gas pressure leak bag instead of sound of exhaust word opening and can't injection-inspection gas supply pressure is 0.4 MPa above, also please check whether the pulse valve diaphragm rupture or wear happened to replace diaphragm that can work. 
(4)在运行过程中要经常注意各传动部位的润滑及除污更换润滑油、脂。对气包要定期进行排污。
(4) during operation often pay attention to the transmission part and the lubrication decontamination oil changing, fat. Air bag to regularly sewage. 
(5)该除尘设备必须设置专人管理,严格按操作规程操作,维修工要熟知各部件的原理,掌握调整与维修方法,并建立运行记录。
(5) the dust removal equipment must set the specialist management, strict according to the operation procedures, maintenance technician to known as the principle of various components, and master the adjustment and maintenance methods, and establish the operation records. 

七、技术性能参数表/ technical Neng Can decimal

型号model

内容content

LDMC ——32

LDMC ——48

LDMC ——64

LDMC ——80

LDMC ——96

LDMC ——112

总过滤面积(m2

Total filtering area (m2)

24

36

48

60

72

84

过滤风速(m/min

Filtering wind speed (m/min)

1.04 ~ 1.67

1.15~1.62

1.21~1.74

1.25~1.67

1.27~1.62

1.28~1.68

处理风量(m3/h

Deal with air volume (m3 / h)

1500~2400

2500~3500

3500~5000

4500~6000

5500~7000

6500~8500

滤袋数量(条)

The filter bag number (a)

32

48

64

80

96

112

耗气量(m3/min

Gas consumption (m3 / min)

0.032

0.048

0.064

0.08

0.096

0.11

入口浓度(g/Nm3

The entrance concentration (g/Nm3)

<200

出口浓度(mg/Nm3

Export concentration (mg/Nm3)

<50

喷吹压力(MPa

Injection pressure (MPa)

0.5~0.7

承受压力(Pa

Under pressure (Pa)

5000

设备阻力(Pa

Equipment resistance (Pa)

≤1200

脉冲阀

Pulse valve

规格specifications

1”

数量Number

4

6

8

10

12

14

电机型号功率

Motor model power

Y90S—2

Y90L—2

Y100L—2

Y132S1—2

Y132S1—2

Y132S2—2

kw

1.5

2.2

3.0

5.5

5.5

7.5

设备重量

Machine weight

LDMCA

1350

1620

1850

2360

2800

3200

LDMCB

1220

1470

1670

2150

2540

2880

注;表中所列重量不包括风机重量,在向土建提荷载时,动荷载系数为1.2。
Note; Listed in the table weight not including fan weight, to carry loads in civil engineering, dynamic loading coefficient is 1.2. 


LDMC脉喷单机除尘器

LDMC脉喷单机除尘器


本文摘自常州市清泉环保成套设备有限公司(http://qqepe.fht360.com/),转载需标明出处。


联系我们

  • 常州市清泉环保成套设备有限公司

  • 赵总
  • 13775111076
  • 0519-85772778
  • 0519-88605670
  • QQepe@sina.com
  • 江苏省常州市武进区横山桥镇芳茂工业区四号